Pine Property Services: Schedule of values
Schedule of values for Pine Property Services. 12 contract line items, one per work order, plus a total line. Each scheduled_value is the approved estimate for that item and the column sums to 3858.00, the original contract sum every payment application starts from. labour_allowance plus material_allowance equals scheduled_value on every line, and each allowance sits a fixed margin above the recorded cost: 65.00 on labour and 20.00 on materials, which is where the 85.00 per item of estimate-over-actual comes from.
item_no,work_order_id,property_id,description,labour_allowance,material_allowance,scheduled_value
01,WO-01,PROP-1,Door adjustment at Fictional workspace 1,195.00,45.00,240.00
02,WO-02,PROP-2,Tap replacement at Fictional workspace 2,260.00,48.00,308.00
03,WO-03,PROP-3,Lighting repair at Fictional workspace 3,325.00,51.00,376.00
04,WO-04,PROP-4,Door adjustment at Fictional workspace 4,195.00,54.00,249.00
05,WO-05,PROP-5,Tap replacement at Fictional workspace 5,260.00,57.00,317.00
06,WO-06,PROP-6,Lighting repair at Fictional workspace 6,325.00,60.00,385.00
07,WO-07,PROP-1,Door adjustment at Fictional workspace 1,195.00,63.00,258.00
08,WO-08,PROP-2,Tap replacement at Fictional workspace 2,260.00,66.00,326.00
09,WO-09,PROP-3,Lighting repair at Fictional workspace 3,325.00,69.00,394.00
10,WO-10,PROP-4,Door adjustment at Fictional workspace 4,195.00,72.00,267.00
11,WO-11,PROP-5,Tap replacement at Fictional workspace 5,260.00,75.00,335.00
12,WO-12,PROP-6,Lighting repair at Fictional workspace 6,325.00,78.00,403.00
13,,,Original contract sum,,,3858.00
Specifications
- Document Set
- construction
- Industry
- trades-property
- Source Kit
- trades-property
- Synthetic
- true
- As Of
- 2026-09-08
- Rows
- 13
- Items
- 12
- Contract Sum Usd
- 3858.00
- Encoding
- UTF-8
Testing contract
Expected to pass- Scenario
- Import the schedule, total the scheduled_value column and check it against the two allowance columns.
- Expected result
- The 12 item rows sum to 3858.00, matching the total line and line 1 of application-for-payment-002-summary.csv. labour_allowance plus material_allowance equals scheduled_value on all 12 lines, and subtracting job-cost-report.csv gives exactly 65.00 and 20.00 of margin per item, 1020.00 in total.
What is a .csv file?
CSV (Comma-Separated Values) is a plain-text tabular format where rows are lines and fields are separated by commas, with quoting rules for values that contain delimiters, quotes, or newlines. It has no formal type system and depends on encoding and dialect conventions. It is the most portable format for tabular data exchange.
How to use this file
Use an example CSV to test parsers against quoting and embedded-delimiter edge cases, header handling, encoding detection, and import pipelines into databases or spreadsheets.
How to use this file for testing
“Pine Property Services: Schedule of values” is a deterministic Testaroo fixture for Data import. Realistic faker-generated datasets with documented schemas for testing import and ETL flows.
Documented properties for this file: 13 rows · UTF-8. Compare results against paired or grouped companions on this page when present (clean↔damaged, searchable↔scanned, or format twins) so scores stay reproducible across runs.
Download the file once, keep the path stable in CI or local scripts, and treat the spec table as the contract: dimensions, seeds, field lists, and roles are intentional. Corrupt or invalid samples are labelled as such, expect parsers to fail loudly rather than silently accept them.
Data fixtures document their exact quirks (delimiters, encodings, null handling, schema, and row counts) in the spec table. Point your parser or importer at the file and assert it handles the documented edge cases; clean and deliberately-messy siblings make before/after diffs straightforward.
Code examples
import pandas as pd
df = pd.read_csv("schedule-of-values.csv")
print(df.head())
print(df.dtypes)Generated by generation/industry_documents.py. Free for any use, no attribution required, license.
Related files
- csvPine Property Services: Application for payment whose retainage was withheld at the wrong rateApplication for payment whose retainage was withheld at the wrong rate for Pine Property Services. The same nine lines as application-for-payment-002-summary.csv, but lines 5a and 5b were computed at 5 percent while their own descriptions still read 10 percent. Retainage reads 162.40 instead of 324.80, so the current payment due on line 8 reads 1744.60 against the correct 1582.20, 162.40 too much.

- csvPine Property Services: Approved change order registerApproved change order register for Pine Property Services. 2 approved change orders: an addition of 420.00 for extra door hardware and a credit of -165.00 for deleted lighting scope, a net 255.00. The running contract sum moves from 3858.00 to 4113.00, which is line 3 of the payment application. A credit change order is a negative amount, not a separate document type.

- csvPine Property Services: Completion inspection registerCompletion inspection register for Pine Property Services. 9 inspections, one for each completed work order. 8 passed and 1 needs a follow-up, INSPECT-6 against WO-06. follow_up_required is derived from result and agrees with it on every row. Every note carries the standing caveat that these are operational checks, not regulated certificates.

- jsonPine Property Services: Construction reconciliation assertionsConstruction reconciliation assertions for Pine Property Services. The eight identities this set claims with the figure each must produce: a 3858.00 contract sum moving to 4113.00, 3248.00 completed and stored, 324.80 retained, 1582.20 due, and a job cost variance of 1020.00. It also records the 162.40 size of the deliberate defect.

- csvPine Property Services: Cost code budget against actualCost code budget against actual for Pine Property Services. Two cost codes and a TOTAL row. Labour is budgeted 3120.00 against 2340.00 actual and materials 738.00 against 498.00, so the total budget 3858.00 is the contract sum and the total actual 2838.00 is the job cost report. The percentages are variance over budget: 25.00 on labour, 32.52 on materials and 26.44 overall.

- jsonPine Property Services: Job cost report JSONJob cost report JSON for Pine Property Services. The same 12 work orders as job-cost-report.csv with the margin rule stated explicitly. totals.variance is 1020.00, which is 85.00 times the 12 work orders.
